Electric Substation Construction, Installation, and Maintenance - Team Power Group serves the power line industry with services like: Transmission Line Maintenance, Re-builds, Upgrade, Relocation and Inspections. Installation of Steel, Wood or Concrete Poles and Steel Towers, Fiber Optic Services Overhead, High Voltage Underground and Foundations.
Country: 192.185.113.186, North America, US
City: -95.4739 Texas, United States
What a great story. I felt like I wads walking with Mr. Palmer through his life. He has always been an inspiration to me. I cried when I heard of his passing. No line will ever fill his shoes. Society could learn so much by reading this book. Wouldn't it be a wonderful world if we treated people the Mr. Palmer did. It was indeed a life well played.
I have just completed the 24-day challenge for the first and last time. I will not do it again because it was very expensive and I do not believe that all the supplements were nearly as effective as the diet changes and exercising. I changed my diet drastically for this program and worked out 7x/week for an hour each time. I lost about 15 pounds on the 24-day challenge.